On the Critical Path
On the Critical Path
Overview
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Similar
Uranium Drive-In (2013)
Wolsong: Vanishing Town (2019)
Th (Part 11: Dr. Helen Caldicott) (2014)
Versprechen Kernfusion? - Der Wettlauf um die Energie der Zukunft (2023)
The Red Princess (2022)
Sista varningen! (1980)
We Are the Guinea Pigs (1980)
Atom and its energy (1958)
The Battle of Chernobyl (2007)
Fission (2025)
Atomic: Living in Dread and Promise (2015)
Douglas Point Nuclear Power Station: Design and Construction (1969)
Nuclear Power Demonstration (1963)
This Nuclear Age (1973)
On Power Refuelling (1971)
Inside The Atom (1948)
Inside Chernobyl with Ben Fogle (2021)
Atomic Hope: Inside the Pro-Nuclear Movement (2023)
Seabrook 1977 (1978)
Letter from Tokyo (2018)













